Khurda, 28/5:A minor soil caving in occurred this afternoon at Tunnel No. 4 on the Khurda-Bolangir Railway line, it is due to loose soil formation and continuous rainfall in the area. There has been no impact on manpower or machinery, and the incident will not affect the overall progress of the project. All necessary safety measures are in place, and work continues as planned.
Clarification on Tunnel No. 4 – Khurda-Bolangir Railway Line (under construction)
