Tata Steel Meramandali Conducts Full-Scale Emergency Mock Drill
Meramandali, August 23, 2024: Tata Steel Meramandali (TSM) conducted a full-scale on-site emergency mock drill at its Captive Power Plant (CPP) as part of the Angul District Crisis Group's schedule, on August 23, 2024. The drill simulated a fire scenario at the LDO tank area of the 165MW power unit. The mock drill was supervised…
