TPCODL Enhances Infrastructure by successfully installing and charging a new 33KV feeder line in Dhenkanal Division
Approximately 36,000 Consumers to reap the benefits of improved power distribution infrastructure
Bhubaneswar, June 25 2024: TP Central Odisha Distribution Limited (TPCODL), a joint
venture of Tata Power and the Government of Odisha, has undertaken significant
infrastructure upgrades to address the surge in electricity demand due to recent
heatwaves. TPCODL has constructed new 33KV and 11KV feeders to ensure reliable and
high-quality power supply for its customers.
In a significant achievement, the TPCODL team in the Gondia Subdivision, led by the
Distribution Engineer Division (DED) in Dhenkanal Division, completed and energized a
new 33KV feeder line. This 6-kilometer line extends from the Gondia 132/33 KV Grid
Substation in Dhenkanal District, enhancing the power distribution infrastructure.
This upgrade benefits around 36,000 consumers in Gondia, Nihalprasad, and Joranda.
With the new feeder line operational, power outages in these areas have significantly
decreased, improving electricity reliability.
Previously, the Gondia Subdivision relied on a 36-kilometer 33KV feeder line from the
132/33KV Gundichapada Grid Substation. The new 33KV Gondia feeder, at just 6
kilometres, addresses a longstanding issue and fulfils a key project for the DED
Dhenkanal Division.
Expressing gratitude, Mr. Arvind Singh, CEO, TPCODL, remarked, “This initiative
highlights our commitment to ensuring reliable and quality power supply for our
customers, especially during challenging times such as heatwaves. I extend my sincere
thanks to the dedicated efforts of our O&M Staffs, Project team, E&MR team, MMG
team and everyone involved in the successful completion and commissioning of the new
feeder line.