Ayodhya,4/01(AO Bureau)It has been about 5 months since the foundation stone of the land for the construction of the Ram temple in Ayodhya being laid. During this time, many technical problems are coming up in the construction of the temple. In such a situation, the work of laying its foundation has not been done yet. Meanwhile, General Secretary of Ram Janmabhoomi Tirthakshetra Trust and Vice-President of Vishwa Hindu Parishad Champat Rai have given information in this regard. He has told that many difficulties are being faced in the construction of the Ram temple. The ground of the construction site is friable.
According to Champat Rai, on the day the temple construction starts, the Ram temple will be ready within 36 to 39 months from that day. It will be a temple made entirely of stones. About four lakh cubic meters of stone will be used from the top of the foundation to the entire temple. He also told that it was believed that the construction of the temple would begin in June. But the study of land has not been completed yet. The land at the construction site is very rough. That’s why there is a problem.